WP 1.1 – Specification (1.09.2025 – 31.10.2025)
WP 1.2 – CoCrMo material design & manufacturing (1.10.2025 – 30.09.2027)
WP 1.3 – CoCrMo traditional manufacturing performance analysis (1.01.2026 – 30.11.2026)
WP 1.4 – Heat treatment of CoCrMo components (1.02.2026 – 31.01.2028)
WP 1.5 – Performance analysis after heat treatment (1.04.2026 – 31.03.2028)
WP 1.6 – CoCrMo powder manufacturing & characterization (1.06.2026 – 31.05.2028)
WP 1.7 – Sintering of CoCrMo powder (1.09.2026 – 31.05.2028)
WP 1.8 – Summary of results and material transportation (1.09.2026 – 31.08.2028)
WP 2.1 – Specification (1.09.2025 – 31.10.2025)
WP 2.2 – DMLS process parameters development (1.10.2025 – 31.05.2028)
WP 2.3 – Quality evaluation of DMLS CoCrMo-components (1.01.2026 – 31.08.2028)
WP 3.1 – Specification (1.09.2025 – 31.10.2025)
WP 3.2 – Microstructure analysis of DMLS components (1.10.2025 – 31.05.2028)
WP 3.2.1 – Observe and analyze the morphology of different surfaces of the DMLS-CoCrMo component (1.10.2025 – 31.05.2028)
WP 3.2.2 – Measure the phase composition, mechanical properties, and biocompatibility of the DMLS-CoCrMo component. (1.10.2025 – 31.05.2028)
WP 3.3 – Comparison of DMLS and traditional manufactured components (1.03.2026 – 30.06.2028)
WP 3.3.1 – Preliminary heat treatment design for DMLS-CoCrMo components (1.03.2026 – 30.06.2028)
WP 3.3.2 – Comparison of mechanical properties and biocompatibility of DMLS-CoCrMo components before and after heat treatment (1.03.2026 – 30.06.2028)
WP 3.4 – Performance analysis of DMLS-formed components after heat treatment (1.06.2026 – 31.07.2028)
WP 3.4.1 – Design and development of heat treatment process steps for DMLS-CoCrMo component (1.06.2026 – 31.07.2028)
WP 3.4.2 – Mechanical and biocompatibility testing of components after thermal treatment improvements (1.06.2026 – 31.07.2028)
WP 3.5 – Biocompatibility testing of DMLS-formed CoCrMo components (1.09.2026 – 31.08.2028)
WP 4.1 – Specification (1.09.2025 – 31.10.2025)
WP 4.1.1 – Refinement of the experimental plan and construction of setup for EPP (1.09.2025 – 31.10.2025)
WP 4.1.2 – Refinement of the experimental plan for surface performance and EPP (1.09.2025 – 31.10.2025)
WP 4.1.3 – Exchange existing results and transfer print components to CUT and Plasotec (1.09.2025 – 31.10.2025)
WP 4.2 – EPP parameter development (1.10.2025 – 31.05.2028)
WP 4.3 – Surface performance verification after EPP (1.06.2026 – 31.08.2028)
WP 4.4 – Combined EPP processes development (1.10.2025 – 31.05.2028)
WP 4.5 – Inner & External surface CoCrMo components evaluation (1.06.2026 – 31.08.2028)
WP 4.6 – Secondary surface modification of EPP-processed components (1.06.2026 – 31.08.2028)
WP 4.7 – Results summary & dissemination (1.09.2026 – 31.08.2028)
WP 4.7.1 – Summarize the results of WP4.3 and WP4.5 and prepare reports and papers (1.09.2026 – 31.08.2028)
WP 4.7.2 – Summarize the results of WP4.6 and prepare reports and papers (1.09.2026 – 31.08.2028)
WP 5.1 – DMLS manufacturing of dental implant demonstrator (1.10.2025 – 29.02.2028)
WP 5.2 – EPP treatment of dental implant demonstrator (1.01.2026 – 31.05.2028)
WP 5.3 – Surface property test of dental implants demonstrator (1.06.2026 – 31.08.2028)
WP 5.3.1 – Surface roughness and passivation properties of dental implants demonstrator (1.06.2026 – 31.08.2028)
WP 5.3.2 – Biocompatibility tests of dental implants demonstrator (1.06.2026 – 31.08.2028)